Insides delivered a full-spec temporary OB facility for Al Jazeera Sport’s Olympic coverage into the 19th floor of Dennison Point, a block of 1960s council flats, just outside the Olympic Park; a similar building to that in which the BBC set up one of its main Olympic broadcast studios. Constructed at such a highly unusual location, the project met with some unique challenges: physical limitations, asbestos, structural floor loading, fire proofing, power and zero tolerance deadlines were just some of the issues that had to be overcome. To their credit Insides successfully over delivered 550m2 of specialist fit-out within an incredibly tight two month build programme. Insides ensured that Al Jazeera were able to broadcast successfully and continued to supply us with support during the Olympics themselves.
We would have no hesitation whatsoever in recommending the services of this Company as commercial fit-out contractors. Insides may be a small company but they punch above their weight, and have the flexibility and level of service often lacked by larger companies.”